Client

Korea High-speed Rail Construction Authority (KHRC)

Background

The South Korea high-speed railway is a $13.4 billion, 260-mile system that connects Seoul to Pusan. The trains travel at more than 180 miles per hour, carry 1,000 passengers, and leave each terminal station at scheduled five-minute intervals.

Solution

WJE engineers conducted visual evaluation of the constructed civil works and selected locations for sample removal to evaluate the properties of the construction materials. Laboratory tests of the samples included compressive strength testing and petrographic characterization. Nondestructive evaluation (NDE) techniques were utilized to check the reinforcing bar placement and quantities as well as to evaluate the depth of foundations and the integrity of the buried concrete piles. The engineers also used NDE techniques to evaluate embankments for poorly consolidated fill materials. The inspection verified the thickness of the tunnel liners and culvert walls and slabs.

WJE also inspected the slopes of earthwork cuts for soil failures due to inadequate slope or benches and conducted tests at frequencies to provide a database to comment on the quality aspects of the construction. Finally, WJE recommended aspects of the construction that needed improvement based on the quality audit database.