Client

Davis Brody Bond Architects

Background

Owned by Columbia University, the Manhattanville development project is a 25-year undertaking that will include new academic, civic, cultural, and commercial facilities. The 17-acre site will incorporate publicly accessible open boulevards and spaces, including two large plaza areas located over occupied space. The 2 million square feet of below-grade structures will extend 80 feet below street level and include space for academic research, parking, and support services. Slurry walls will be constructed at the perimeter of the site to create a large "bathtub" excavation for the multiphase project.

Solution

WJE provided waterproofing design services for the plaza decks and roofs, including design development, construction documents, and construction administration support services.

After researching alternative schemes, WJE architects are proceeding with a plaza waterproofing design that will incorporate a hot-rubberized asphalt membrane in a split slab configuration. Roof waterproofing systems will consist of hot-rubberized asphalt in a protected membrane roof assembly. Project work is expected to conclude in 2030.