WJE designed and installed a state-of-the-art instrumentation and monitoring system to achieve the project objectives. Key elements included the following: Installation of more than eighty strain gages, displacement gages, and thermocouples on the trusses during construction and monitoring of data collected from four networked data acquisition units
Wireless collection of survey data for sixty-eight monitoring points as measured by two remote survey stations during the roof lift
Utilization of a local area wireless network to connect six data acquisition systems for broadcast of acquired data to lift participants
Implementation of a centralized database collection system to allow access and management of data for multiple users simultaneously
Development of software capable of processing and graphing real-time and historical data in a user-friendly interface