In consultation with the aluminum panel manufacturer, WJE designed very large aluminum panels, many over six feet wide and nine feet tall, to meet the structural requirements of the project
In an effort to minimize costs, the EIFS and interior gypsum board were removed, but the existing steel studs and horizontal track were left in place to provide structural support for the new rainscreen
WJE also designed repairs to the steel studs where significant corrosion had occurred
Project was taken from design to completion in less than two years without any significant change orders