Concluded that most of the fire had been confined to the timber roof structure and that structural damage to the masonry walls was minimal
Developed conceptual repairs to restore the fire-damaged masonry and concrete, replace the roof with new framing, and tie the new roof to the existing masonry walls to improve the seismic performance of the structure
Designed repairs to restore the structure to its original appearance and function