Close-up condition inspections of each block recorded in the field on scaled elevation drawings prepared with rectified photography
Material testing including in situ cleaning and paint removal tests and petrographic evaluation of stone
Evaluation report including preparation of a detailed technical report and a presentation recommending repair alternatives before City Landmarks Board
Construction documents including preparation of technical specifications and detailed drawings for complete architectural rehabilitation
Construction administration including performing site inspections to allocate repairs and monitor work